The program distinguishes between three types of capacities. These are arranged hierarchically. Each level contains the subordinate levels.

The top level is the work centre group.

Work centres are assigned to the work centre groups. Every work centre can only belong to one work centre group.

You can assign various machine centres to every work centre. A machine centre may only belong to one work centre.

Planned capacity of a work centre consists of the availability of the corresponding machine centres and the additional planned availability of the work centre.

The planned availability of the work centre group is thus the sum of all corresponding availabilities of the machine centres and work centres.

The availability is stored in calendar entries.